Well. We're back. Me and the kids took off for ages while Lev worked his butt off on the house as well as finishing up at his job. Abel broke his arm before we left and ended up in surgery twice to have the bones straightened out. He had the plaster off last week but he still has some healing to do. In the meantime Lev has got so much done, along with the help of some really generous friends... although I have a feeling with me and the kids gone the house became a bit of a man-cave.
Anyway, here's what's been happening.
|
new tap and stand. ive never seen such a lovely tap. |
|
this was taken before we left. Abel in his fresh plaster. we'd just received our
black and white tiles and got excited so we layed them out for fun. |
|
lev replaced the flanges on our throne
and re-siliconed the bowl to the floor. |
|
the roof is finished!!!! |
|
new slab thanks to our very hard working friends. |
|
kitchen as it is now. a lot of progress has been made but it still needs floor tiles, splashback, cement bench and sink.
|
|
lev spent tonight forming up the bench for under the sink.
and i painted all night. those photos will come later. |
Love the kitchen!!! Its coming along sooooo well!!
ReplyDeleteWow......
ReplyDelete